|
Week 10 |
|
|

Note the static system
is filtered so no dust gets in to your instruments.
|

Another job not
in your manual, don't discard it or you'll end up replacing
expensive instruments.
|

|

The
overhead switch panel all engraved available from our parts
department with the decal pack and compliance plates.
|
|

Our own strobe pack
very light and cheap all parts supplied from our parts department
as a kit.
|

|
|
|

Instrument Panel
fully installed. It looks just great and all the electronics
worked first time with no faults but all this is around a weeks
work.
|
|
|

Glassing the screen
edges with Shuffler epoxy resin.
|

Fill the holes with
playdoe first so the resin does not fill the holes fill and
sand for final finish.
|

Here we have an extra
earth strap to water pump alternator and air frame.
|
This
is so important, just because it's not in your building manual
don't disregard it.
|

The
split tub makes doing the wiring and cleaning up all the underside
so easy you can get it neat and tidy.
|

|
|
|
| |
|
|
|
| |
|
|
|