Builder Assistance

Mr Lawrence O'Connell from NSW at the factory using our Builder Assistance Program.

See his progress in this week by week presentation of pictures.

Page 6

Wait for all thumbnails to load, then click to enlarge.

Week 11

Lawrence doing final assembly checks and painting every single nut and bolt once they are checked.

 

Lawrence and I doing final assembly with only one more week to go.

The split tub finished and installed for the final time.

 

Tub underside.

Starting to look like a Rotorway Exec 162 FA Series One.

 

Screen going on and now's the time to drill the holes out to the correct size.

 

No more Clecos!

All the parts back from the paint shop and the blades are ready to paint.

 

 

 

Fuel tanks finally installed and leak tested.

 

Tail rotor finally installed and belts tensioned .

 

Rear fuel tank straps.

Exhaust brackets made, painted and lock wired.

 

Ballast weight installed.

 

FADEC'S installed make sure you have a very good earth.

This is the only coolant to use and you need the DCA 4 as well.

 

     
     

   
   

 



 

 

© Copyright Rotorway International Australia

Site Designed, Hosted & Maintained by
RDSWebs